271'000francs from the costed items since 2009
> 350'000francs in material costs alone (owners' estimate, excluding their own labour)
17documented works between 2009 and 2026
Chronology

What was done and when.

The amounts are rounded figures provided by the owners. A considerable part of the work was carried out by the owners themselves; labour costs are hardly included.

1990sBuilding envelope completely renewedFacade, windows and external insulation; according to the owners, probably the roof as wellnot costed
2009Loft convertedincluding insulation of the entire roof space and the extension35'000
2009Heating and two electrical distribution boards completely renewed40'000
2015New roof tiles on the extension5'000
2016All waste water pipes renewedThe previous pipes had in part not been installed properly and were replaced completelynot costed
2019Basement convertedThe basement corresponds roughly to the footprint of the house, approx. 70 m², is fully finished and was most recently used as dog boarding kennels30'000
2019New windows with triple glazing30'000
2020New heat pump heating25'000
2020Main water pipe completely renewednot costed
2020Garden redesigned40'000
2021Aluminium window reveals, new shutters25'000
2022New kitchen25'000
2026Ground-floor bathroom renovated6'000
2026Water pipes in the ground-floor bathroom renewednot costed
2026Further work and redesign in the garden10'000
ongoingRenovations and improvements to individual rooms2009 to 2026, including the bathroom on the first floornot costed
Total of the costed itemsCHF 271'000
Receipts

Invoices and quotes are available.

Supporting documents from the contractors for the following work are in the sales file. They can be inspected if you are seriously interested in buying.

Building services

  • Arnold & Strebel GmbH: heating
  • CB Haustechnik: heating
  • Two invoices for electrical installation

Water and waste water

  • Invoice for water pipe
  • Documentation of water pipes

Windows and facade

  • Quote from Schmidiger Fenster
  • Alurex: reveals and shutters

Property documents

  • Land register extract
  • Building insurance (AGV)
  • Material statement for the modernisation
Transparency

What else you should know.

We disclose known points ourselves rather than leaving them to be discovered in a later inspection.

Earlier water damage, repaired

There was once water damage at the old main water pipe into the house. The main pipe was completely renewed in 2020, which has eliminated the cause. The owners are not aware of any other major damage or natural hazard events.

Ground-floor bathroom

The ground-floor bathroom currently has no shower. A shower can be retrofitted. The bathroom on the first floor has a shower and corner bath.

Floor plans

The available floor plans come from the window manufacturer and do not reflect the current condition in every detail. Since the original plans, an extension has been added and several walls have been removed. The situation on site is authoritative.

This list is based on the owners' written information on condition and maintenance history and on the invoices and quotes in the sales file. The amounts are rounded figures provided by the owners and are given without guarantee. As of 30 August 2026.