Maygutstrasse 26, 3084 Wabern (Köniz) · parcel no. 5711 · 761 m²

What was done to the house and when.

Built in 1952 as a single-storey bungalow, extended by an attic storey in 1969/70, extensively renovated in 2005 and unoccupied for around ten years. So that you can form a picture before you do the sums: here is what was done and when, with sources.

← Back to the property page
1952Year built according to the building insurance
940 m³Building volume, 2004 estimate
139 m²Building footprint according to the land register
150 m²Net living area (rounded) on 2 floors
Chronology

Seven decades in eight steps.

The information comes from building plans, the 2004 market value appraisal, the 2005 construction accounts, the 2026 inspection report and information from the owners. The source is given for each entry.

1951/52New build as a single-storey house with garageSolid construction, central oil heating, air-raid shelter in the basement.Execution: building plans of 3 December 1951Building plans, building insurance GVB
1969/70Loft conversionTwo rooms of approx. 26 m² each, WC/shower, two lofts: the «bungalow» becomes a two-storey house.Execution: architect Heinrich Schubnell, SpiegelPlanning application drawings 1969, information from the owners
1969 to 2005Ongoing maintenanceWindows replaced in stages, blinds renewed (Dellsperger), front door with security lock.Execution: various firmsInformation from the owners
2004Market value appraisalCondition without significant maintenance backlog; recommendation: refresh the surroundings and garage driveway.Execution: U. Seiler + Partner, StettlenAppraisal of 15 July 2004
2005Full renovationKitchen, windows and floor coverings (joiner), electrical installations, plumbing and heating installations, plastering and painting, tiling, upstairs bathroom, external railings, roof base pipe. Construction accounts net approx. CHF 162'000.Execution: architect Josef Wyss, Häutligen; including Walther + Fankhauser (electrics), Krebs AG (plumbing/heating), Morgenthaler (joinery)Construction accounts of 15 August 2005
2007AwningsTwo awnings on the south side.Execution: DellspergerInformation from the owners
from approx. 2015House unoccupiedNo further maintenance; the garden becomes overgrown, martens infest the roof.Electrical inspection 2026
2026Periodic electrical inspection (NIV)Installation disconnected from the grid due to marten damage; earthing to the old scheme; a renovation is required before it is put back into service.Execution: energiecheck bern agInspection report of 7 April 2026
Receipts

These documents are available.

The documents are part of the sales dossier and can be viewed if you are seriously interested in buying. We provide the historical building plans directly as a PDF.

Construction and conversion

  • Building plans of 3 December 1951
  • New-build plans October 1951: ground floor, sections, facades
  • Site and drainage plan 17 December 1951
  • Construction drawing of the garage driveway 4 November 1952
  • Planning application drawings loft conversion 1969, nos. 3 to 8
  • Building insurance certificate GVB
  • Current floor plans: none available

Renovation 2005

  • Construction accounts of 15 August 2005
  • Invoices from the firms involved

Valuation and inspection

  • Market value appraisal U. Seiler + Partner, 15 July 2004
  • NIV inspection report energiecheck bern ag, 7 April 2026

Property documents

  • Land register extract
  • Cadastral plan
  • Information from the Köniz building inspectorate
Assessment

What this means for you.

We disclose the known issues ourselves rather than leaving them to a later inspection.

The 2005 renovation was twenty years ago

Kitchen, windows, floors, electrics, plumbing and heating were renewed in 2005 for approx. CHF 162'000 net. Since the occupants moved out around 2015, nothing more has been invested. The structure is solidly built and the layout simple; today, however, you should expect a comprehensive renovation of the heating, electrics, roof, bathroom and building envelope.

Electricity: disconnected from the grid

The periodic inspection in April 2026 disconnected the installation from the grid due to marten damage. The earthing follows the old scheme. Before it can be put back into service, the electrical installation must be renovated, a point you should plan for with your electrician or site manager before the viewing.

Roof and attic storey

The attic storey dates from the 1969/70 conversion and was renovated along with the rest in 2005. The marten infestation affects the roof and installations; the roof should be checked for damage before you set the renovation costs.

Historical plans instead of current floor plans

No current floor plans are available. The original building plans are available: site and drainage plan from 1951, project draft and new-build plans from October 1951 with ground floor, longitudinal and cross sections and all four facades, the construction drawing of the garage driveway from 1952 and the planning application drawings for the loft conversion from 1969. We have sorted the 25 photos of the plans and compiled them into a 20-page PDF . These are photographic reproductions, not to scale; the current building has not been checked against them. The conditions on site are authoritative; if you are planning, take your own measurements at the viewing or bring your planner along.

Pollutants

In a building from 1952, asbestos, PAHs and PCBs are to be expected. No current pollutant screening is available; one is needed before any renovation or demolition.

This overview is based on the building plans from 1951/52, the planning application drawings for the 1969 loft conversion, the building insurance certificate, the market value appraisal of 15 July 2004, the construction accounts of 15 August 2005, the NIV inspection report of 7 April 2026 and information from the owners. All information without guarantee. As of 25 September 2026.